Road Conditions

North Lake Tahoe Area


I-80(Sierra Nevada), Hi-way 267, Hi-way 431 (Mt Rose Hi-way) And SR-28 & 89(NLT)
California road conditions: Phone # 1-800-427-ROAD
Website: http://www.dot.ca.gov/cgi-bin/roads.cgi
Nevada road conditions: Phone # 1-877-NV-ROADS
Website: http://www.nvroads.com/

North Lake Tahoe 7 Day Weather Forecast
The following road conditions were reported as of:
8:30 AM June 17, 2021

Hi-way 80: 1-WAY CONTROLLED TRAFFIC AT DONNER PASS RD /IN TRUCKEE/ (NEVADA CO) FROM 0600 HRS TO 1300 HRS MONDAY THRU FRIDAY THRU 6/18/21 – DUE TO BRIDGE WORK

Hi-way 267: NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.

Hi-way 431: Roadwork (Minor Delays) – on SR-431 in both directions from SR-28 to Mount Rose Summit in Washoe County Nevada. Single lane closure and speed reduced to 35 miles per hour. Commercial trucks with air brakes traveling westbound are prohibited. Width Limit 14 feet. 30 minutes delay possible. Estimated End date is 10/28/21

Hi-way 89: 1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM RAINBOW DR /IN TRUCKEE/ TO HOBART MILLS /AT PROSSER CREEK/ (NEVADA CO) FROM 0700 HRS TO 1700 HRS MONDAY THRU THURSDAY THRU 6/17/21 – DUE TO MAINTENANCE

Hi-way 28: 1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 6 MI EAST TO 6.5 MI EAST OF THE JCT OF SR 89 /AT SAHARA DR/ (PLACER CO) 24 HRS A DAY THRU 0600 HRS ON 6/18/21 – DUE TO CONSTRUCTION

1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.3 MI WEST OF THE JCT OF SR 267 /AT BEACH ST/ TO THE JCT OF SR 267 (PLACER CO) FROM 2100 HRS EACH NIGHT TO 0600 HRS EACH MORNING SUNDAY THRU FRIDAY THRU 6/18/21 – DUE TO CONSTRUCTION

Reno Area


I-80 (In The Reno Area) Hi-Way 395/580 (In The Reno Area)
And Hi-Way 341 (Virginia City)
Nevada Road Conditions: Phone # 1-877-NV-ROADS
Website: http://www.nvroads.com/

Reno 7 Day Weather Forecast
The Following Road Conditions Were Reported As Of:
8:30 AM June 17, 2021

Hi-way 80: Overnight Roadwork (Minor Delays) – on I-80 East at Exit 15- US-395/I-580 in Reno, Washoe County Nevada. Sunday through Friday from 9 PM to 6 AM intermittent ramp closures with detours in place. Consider an alternate route. Estimated End Time is 6:00 AM on 06/18/21
Roadwork – on I-80 East at I-80 Exit 15 – US395/580 interchange with I80 East in Washoe County Nevada. Ramps will be intermittently closed nightly from 12:00 Midnight to 6:00 AM, Sunday night the 20th to Friday morning the 25th. Traffic will be detoured to Second Street for the east bound I-80 to North bound US-395 closure and to Oddie Boulevard for the east bound I-80 to south bound I-580 closure. Estimated End Time is 6:00 AM on 06/25/21
Truck Restrictions – on I-80 East to US-395 North Ramp in Reno, Washoe County Nevada. Beginning on 4/29/21 to 12/31/21 oversize vehicles will be limited to 67′ in length and 10′ in width. Consider an alternate route. Estimated End date is 12/31/21
Truck Restrictions – on I-80 East to I-580 South Ramp in Reno, Washoe County Nevada. Beginning on 4/29/21 to 12/31/21 oversize vehicles will be limited to 67′ in length and 10′ in width. Consider an alternate route. Estimated End date is 12/31/21

Hi-way 395 (580): Overnight Roadwork – on I-580 southbound from Exit 35 – E. Second St Glendale Ave to Exit 34 – Mill Street in Reno Nevada. Mill Street and 2nd Street offramps will be closed alternately from 9 PM to 6 AM, Sunday night to Friday morning. Detours will be marked. Estimated End date is 06/30/21
Overnight Roadwork – on I-580 South at Mill Street on-ramp in Reno, Washoe County Nevada. Sunday 6/6/21 9 PM through Monday 6/21/21 6 AM, ramp closure with detour available. Ramp closure will be 24 hours a day, 7 days a week. Consider an alternate route. Estimated End Time is 6:00 AM on 06/21/21
Roadwork – on I-580 South at I-580 Exit 34 – Mill Street in Washoe County Nevada. Mill Street on ramp will be closed from 9:00 PM Sunday, June 6th through 6:00 AM Monday, June 21st. Detours for south bound I-580 access will be from 2nd Street. Estimated End Time is 6:00 AM on 06/21/21
Overnight Roadwork (Minor Delays) – on I-580 South from I-80 to Villanova Bridge in Reno, Washoe County Nevada. Sunday through Friday from 9 PM to 6 AM intermittent lane closures with a reduction in speed to 55 MPH. Consider an alternate route. Estimated End Time is 6:00 AM on 06/18/21

Hi-way 341: Open with no controls.

South Lake Tahoe Area


Hi-way 50(In the Sierra Nevada) And SR-89(In the South Lake Tahoe area)
California road conditions: Phone # 1-800-427-ROAD
Website: http://www.dot.ca.gov/cgi-bin/roads.cgi
Nevada road conditions: Phone # 1-877-NV-ROADS
Website: http://www.nvroads.com/

South Lake Tahoe 7 Day Weather Forecast
The following road conditions were reported as of:
8:30 AM June 17, 2021

Hi-way 50: Open with no controls.

Hi-way 89: No traffic restrictions reported for this area.

Carson Area


Hi-way 50 And Hi-way 395 (580) In The Carson City Area
Nevada Road Conditions: Phone # 1-877-NV-ROADS
Website: http://www.nvroads.com/

Carson City 7 Day Weather Forecast
The Following Road Conditions Were Reported As Of:
8:30 AM June 17, 2021

Hi-way 50: Open with no controls.

Hi-way 395 (580): Open with no controls.